Concrete patio cost in Burbank CA by size and finish
Every figure on this page comes from one dated source, constructlytools' Los Angeles slab guide (published January 20, 2026, updated May 19, 2026), so the rows can be compared with each other. These are installed prices for the finished patio, before a permit or the removal of an old slab:
| Patio size | Broom, flat lot ($8 to $12) | Decorative ($12 to $20) | Stamped ($15 to $20) |
|---|---|---|---|
| 10 x 20 ft (200 sq ft) | $1,600 to $2,400 | $2,400 to $4,000 | $3,000 to $4,000 |
| 16 x 20 ft (320 sq ft) | $2,560 to $3,840 | $3,840 to $6,400 | $4,800 to $6,400 |
| 20 x 20 ft (400 sq ft) | $3,200 to $4,800 | $4,800 to $8,000 | $6,000 to $8,000 |
| 20 x 30 ft (600 sq ft) | $4,800 to $7,200 | $7,200 to $12,000 | $9,000 to $12,000 |
Swipe sideways to see every column.
Per-square-foot rates from constructlytools' Los Angeles guide, multiplied out. Decorative covers exposed aggregate and similar finishes. Planning ranges; quotes vary by site.
The guide's own patio line, $1,600 to $9,000 for 200 to 600 square feet, matches the broom-to-reinforced range ($8 to $15 a foot). For finish choices, see stamped concrete in Burbank; for the build itself, see concrete patios in Burbank.
The lot changes the rate
Burbank runs from flat valley streets west of the freeway to steep lots above Sunset Canyon Drive. The guide prices terrain separately:
| Lot | Rate | What changes |
|---|---|---|
| Flat valley lot | $8 to $12 | Truck parks close, little grading |
| Moderate slope | $10 to $15 | Grading, taller forms, maybe a pump |
| Steep hillside | $13 to $20+ | Pump, hand work, often a wall or a soils report |
Swipe sideways to see every column.
Source: constructlytools, Los Angeles slab guide, updated May 19, 2026.
On sloped lots, the concrete on Burbank hillside lots guide explains the grading and wall rules that can come with a patio.

Extras that sit outside the per-foot price
| Item | 2026 range | When it applies |
|---|---|---|
| Remove and haul an old slab | $1.40 to $2.30 per sq ft | Replacing a patio |
| Hand wheel-out of old concrete | $2.50 to $4.00 per sq ft | No truck access to the backyard |
| Pump truck | $500 to $900 | Mixer can't reach the forms |
| Extra grading on a slope | +$2 to $5 per sq ft | Cutting or filling to make a level pad |
| Seismic specifications | +$1 to $3 per sq ft | When the plans call for seismic detailing |
| Soils report | $600 to $1,500 | Hillside lots |
| Permit | $200 to $700 | Only when the work needs one |
Swipe sideways to see every column.
Source: constructlytools, Los Angeles slab guide (updated May 19, 2026). Burbank's own permit fees are set by the City's fee resolution.
Where the money goes on a slab
The guide breaks a 500 square foot broom-finish slab into its parts. The concrete itself is a smaller share than most people expect:
| Line item | Range |
|---|---|
| Labor | $1,600 to $2,750 |
| Ready-mix concrete | $1,100 to $1,590 |
| Rebar | $400 to $750 |
| Site prep and gravel base | $300 to $800 |
| Forms | $120 to $320 |
| Vapor barrier | $80 to $180 |
| Curing compound | $75 to $200 |
Swipe sideways to see every column.
Source: constructlytools' breakdown for a 500 sq ft broom slab, updated May 19, 2026. Ready-mix runs $149 to $177 a cubic yard delivered; finishers $32 to $55 an hour.
Ways to bring the price down
- Use a broom finish on most of the slab and save stamping or color for a border or the seating area ($4 to $8 a foot saved on the plain part).
- Bundle the tear-out with the new pour; the guide cites 10 to 18 percent off demolition when it's bundled.
- Schedule between October and March, which the guide says can leave room to negotiate.
- Keep the shape simple: straight edges form faster than curves.
- If the backyard has a wide side gate or driveway access, say so; it can save the pump and the hand wheel-out.
What a written quote should list
Square footage, thickness, rebar size and spacing, base depth, the finish, where the control joints go, how the slab drains, tear-out and haul-off, the cure time before use, and whether a permit is included. California law also requires the contractor's license number on the contract.
Ready to price a real patio? Start from the concrete contractor in Burbank page or send the quote form.

