Burbank concrete permits, job by job
The City of Burbank publishes a one-page handout, "Single-Family Residential: Work Exempt from Building Permit," under the 2025 California Residential and Building Codes. It is the quickest answer for most house jobs, and it comes with two warnings in capitals: exempt work still has to meet every other code rule, such as setbacks, and anything that strays from the listed limits needs a permit and may need zoning approval.
| Job | Permit | Where the rule is |
|---|---|---|
| Driveway or walk on the lot, up to 30 in above grade | Usually exempt | 2025 exemption handout |
| Driveway or walk on an accessible route, or over a basement | Building permit | Building and Safety |
| Retaining wall up to 4 ft from bottom of footing, no surcharge | Usually exempt (zoning limits apply) | Handout; BMC 10-1-603(H)(3) |
| Retaining wall over 4 ft, or holding a slope, driveway or building | Building permit | Building and Safety |
| Fence over 7 ft from the bottom of its footing | Building permit | Handout |
| Detached one-story shed up to 120 sq ft | Exempt | Handout |
| Apron, curb cut, curb, gutter or sidewalk | Excavation permit | Public Works, (818) 238-3950 |
| Dig over 2 ft or 100 cu yd, or fill over 50 cu yd | Grading permit | BMC 7-1-104 |
| Slab or footings for an ADU or addition | Part of that project's permit | Tier 2 plan check |
Swipe sideways to see every column.
Exempt doesn't mean anything goes
A driveway that needs no building permit is still held to the zoning code. Burbank Municipal Code 10-1-603 caps hard surfaces, concrete included, at 45 percent of the front yard setback, limits curb openings to 25 percent of the lot width and 15 feet per driveway, and allows circular drives only on lots 100 feet wide or more. Retaining walls in the front setback stop at 30 inches, set 18 inches back from the sidewalk behind a planting strip, and the code says no exceptions are granted for them. Elsewhere on the lot, exposed retaining walls stop at 4 feet.

Those limits are why a wider driveway or a taller front wall is a zoning question before it is a concrete one. The pages on concrete driveway replacement in Burbank and the retaining wall contractor in Burbank page apply them to real lots.
Tier 1 and Tier 2 permits at the counter
When a permit is needed, Burbank sorts it into one of two tiers. Tier 1 permits are simple ones without plan check, mostly issued over the counter and some online through the City's permit portal. Tier 2 permits go through plan check, zoning review or both, which is where additions, new structures and ADUs land; plans move through the City's ProjectDox system. The slab under an ADU foundation in Burbank rides on that ADU's permit rather than getting its own.
- Building and Safety: Community Services Building, first floor, 150 N. Third Street, Burbank, CA 91502.
- Counter hours: Monday to Thursday 8:00 a.m. to 3:30 p.m., Friday 8:00 a.m. to 3:00 p.m., closed noon to 1:00 p.m.
- Building permits and plan check: (818) 238-5220. Planning: (818) 238-5250.
- Planning first if the job might need a land use approval; Public Works, Fire or Burbank Water and Power may also review a project.
Past the property line: Public Works
Everything between the property line and the street (the driveway approach, curb, gutter, sidewalk and parkway) belongs to Public Works. Burbank's own permit FAQ puts it plainly: a driveway on private property is a Building Department question; once the work touches the sidewalk or the approach, call Public Works at (818) 238-3950. Digging there needs an excavation permit under the Municipal Code, with a fee from the City's fee resolution and a deposit that guarantees the street is put back.
What the excavation permit conditions ask for
- Insurance: $1,000,000 aggregate general liability and an additional insured endorsement naming the City, or the permit isn't issued.
- A DigAlert (Underground Service Alert) number before the permit issues.
- Sidewalk cuts replaced to match the existing finish, to the nearest score line, in sections at least 5 x 5 feet, with no more than a 2 percent cross fall to the curb.
- Driveway and pedestrian access kept open unless an alternate plan is approved.
- Roll-off bins in the street on a separate street use permit, good for 14 days.

The Burbank driveway approach and curb cut permit guide walks through an apron replacement from start to finish.
Grading permits and soils reports
Burbank requires a grading permit for moving earth unless the dig stays within 2 feet of depth, leaves no cut slope over 5 feet high and steeper than 1 1/2 to 1, and moves 100 cubic yards or less; fills are exempt up to 50 cubic yards on a lot when they don't change the drainage pattern. Footing excavations for a building, pool or retaining wall that already has a building permit are exempt. When a grading permit is needed, the Director can require an engineering geologist's report unless it is waived, which matters most on the slopes covered in concrete on Burbank hillside lots.
The contractor's side of the paperwork
Business and Professions Code 7030.5 requires every licensed contractor to put the license number on contracts, bids and all advertising, and anyone can check a number on the CSLB website. Contractors from outside Burbank also pay the City's business tax per job when the building permit is issued.
Toluca Lake blocks on the Los Angeles side of the line follow Los Angeles rules instead; see concrete contractor in Toluca Lake. For the work itself, start from the concrete contractor in Burbank homepage.