Concrete on Burbank Hillside Lots

Concrete on Burbank hillside lots runs into rules the valley floor doesn't have: a hillside area the zoning code draws along Sunset Canyon Drive, Walnut Avenue, Bel Aire Drive, Cambridge Drive, Kenneth Road and Scott Road; retaining walls held 8 feet apart; a grading permit once a dig passes 2 feet or 100 cubic yards; and brush clearance in the Very High Fire Hazard Severity Zone. Steep lots also price higher, at $13 to $20 or more per square foot for flatwork.

8 ft between walls
Minimum spacing for two retaining walls in Burbank's hillside area, 6 ft with the Director's approval.
2 ft or 100 cu yd
Dig past either (or fill past 50 cu yd) and Burbank requires a grading permit, unless it's a permitted footing.
200 ft
Total brush clearance the Burbank Fire Department requires around structures in the Very High zone.

Last reviewed October 2026.

Where Burbank's hillside area begins

Burbank doesn't use a hillside zone letter. BMC 10-1-606 defines the hillside area as everything between the city lines with Glendale and Los Angeles and a line of streets: Sunset Canyon Drive, Walnut Avenue, Bel Aire Drive, Cambridge Drive, Kenneth Road and Scott Road. That takes in the streets climbing toward Wildwood and Stough Canyons and the Verdugo foothills in the northeast of the city.

Two easy mix-ups: R-1-H in Burbank means horsekeeping, the Burbank Rancho near Griffith Park, not hillside. And the ground changes as the streets climb: USDA maps the hillside streets as Vista soils over weathered bedrock from about 26 inches down, and the mountain slopes above them as Vista-Cieneba on 30 to 85 percent grades. The Burbank soil, faults and flood map guide has the details.

Houses stepping up a steep hillside among palms above Highland Avenue in Los Angeles
Houses stepping up a steep Los Angeles hillside, each lot cut into the slope.

Retaining walls on a hillside lot

Outside the front yard, a Burbank retaining wall can show up to 4 feet; past that, a second wall steps back. In the hillside area, two retaining walls need at least 8 feet between them (6 with the Director's approval), walls facing downhill must be screened with plants, and an 18 inch planting strip runs along a front or street-side lot line. Only two walls are allowed in the front setback.

Projects that don't fit go through a Hillside Development Permit, handled through Burbank's Administrative Use Permit process with a mailed notice to neighbors within 300 feet. It can approve exceptions, or require a tall wall to be shortened, split into shorter walls or stepped with the slope. Wall limits and the permit line are on the retaining wall contractor in Burbank page; prices are on retaining wall cost in Burbank.

Grading: when moving dirt needs a permit

Burbank's grading permit exemptions (BMC 7-1-104)
WorkExempt whenOtherwise
Excavation2 ft deep or less, no cut slope over 5 ft high and steeper than 1.5:1, 100 cubic yards or lessGrading permit from the Community Development Director
Fill1 ft or less (or under 3 ft and not supporting structures), 50 cubic yards or less, drainage unchangedGrading permit
Footings for a building, pool or retaining wallDug under a valid building permitGrading permit for the extra digging
Importing or exporting earthWithin the limits aboveWritten permit first

Swipe sideways to see every column.

Burbank Municipal Code 7-1-104, read October 2026. Grading plans usually need an engineering geological report unless the Director waives it (BMC 7-1-105(C)).

A driveway replacement on a slope rarely gets near those numbers; cutting a new parking pad or terrace into a hillside often does. A 20 by 20 foot pad cut 2 feet deep is about 30 cubic yards, under the volume limit, but a deeper cut or a larger terrace can pass it quickly.

Fire zone rules and hardscape

CAL FIRE's Office of the State Fire Marshal updated the fire hazard severity zone map on March 24, 2025. Burbank's General Plan describes two Mountain Fire Zones, one along the Verdugo foothills in the northeast of the city and one in the southwest beside the Warner Bros. lot. The June 10, 2025 Bethany Fire, near Amherst Drive and Bethany Road, closed the Wildwood and Stough Canyon trails until the next day.

  • Clearance letters go out in May; work is due by the end of June; inspections start in July
  • Within 100 feet of a structure: dead trees out, weeds under 3 inches, vegetation within 10 feet kept maintained
  • Burbank Fire requires 200 feet of clearance in total
  • ADUs in the Mountain Fire Zone are capped at 800 sq ft, one ADU or one junior ADU per lot

Concrete doesn't burn, so a patio, a walk or a slab along the house is one way to keep the 10 foot strip free of fuel. It also changes where rain goes, so a slab beside the house is pitched away from the foundation.

Hollywood Burbank Airport's terminal and runway below the Verdugo Mountains
Hollywood Burbank Airport below the Verdugo Mountains.

What a hillside lot adds to a concrete price

Slope and access costs, Los Angeles, 2026
ItemRange
Flatwork, flat valley lot$8 to $12 per sq ft
Flatwork, moderate slope$10 to $15 per sq ft
Flatwork, steep hillside$13 to $20+ per sq ft
Old concrete removal, wheeled out by hand on a hillside$2.50 to $4.00 per sq ft (standard lot $1.40 to $2.30)
Concrete pump$500 to $900
Soils report, hillside lot$600 to $1,500
Extra grading on slopes+$2 to $5 per sq ft

Swipe sideways to see every column.

Source: constructlytools, How Much Does a Concrete Slab Cost in Los Angeles in 2026? (updated May 19, 2026), which also suggests a 15 percent contingency on hillside work. Quotes vary by site.

Before hillside concrete work

  • Confirm whether the lot is inside the hillside street boundary
  • Estimate the dig and fill volume against the 2 ft, 100 and 50 cubic yard limits
  • Ask Building and Safety (818-238-5220) whether a soils or geology report is needed
  • Check the fire hazard zone before planning an ADU or new structure
  • Plan where water leaves the new concrete before the forms go in

Hillside lots also shape concrete steps and walkways and ADU foundations. For any other job, see the concrete contractor in Burbank page.

Get a Free Quote

Tell us the job and where it is. There is no charge for a quote.

Burbank Hillside Concrete: Questions

Tall poured concrete retaining wall holding back a slope, with ivy growing on it
A poured concrete wall holding back a slope.
Where is Burbank's hillside area?

Burbank's zoning code (BMC 10-1-606) defines it by streets: the area bounded by the city lines with Glendale and Los Angeles and by Sunset Canyon Drive, Walnut Avenue, Bel Aire Drive, Cambridge Drive, Kenneth Road and Scott Road. Lots on the mountain side of that line follow the hillside development standards.

Is R-1-H the hillside zone in Burbank?

No. In Burbank, R-1-H is the Single Family Residential Horsekeeping zone, the Rancho near Griffith Park. The hillside area is defined separately by street boundaries in BMC 10-1-606.

When does digging on a Burbank lot need a grading permit?

When it goes past the exemption in BMC 7-1-104: an excavation over 2 feet deep, one that leaves a cut slope over 5 feet high and steeper than 1.5 to 1, or more than 100 cubic yards; or a fill over 50 cubic yards or one that changes drainage. Footing excavations under a valid building permit are exempt.

How far apart do retaining walls have to be on a Burbank hillside lot?

At least 8 feet of horizontal distance between two retaining walls, or 6 feet with the Director's approval, with walls facing downslope screened by plants and an 18 inch planting strip along a front or street-side lot line (BMC 10-1-606(F)).

How much more does concrete cost on a hillside?

constructlytools' 2026 Los Angeles guide prices flatwork at $8 to $12 per square foot on flat valley lots, $10 to $15 on moderate slopes and $13 to $20 or more on steep hillsides. Removing old concrete by wheelbarrow on a hillside runs $2.50 to $4.00 per square foot against $1.40 to $2.30 on a standard lot. Quotes vary by site.

When does Burbank require brush clearance?

Properties in the Very High Fire Hazard Severity Zone get letters in May, have to finish clearance by the end of June, and are inspected from July, per the Burbank Fire Department. Within 100 feet of a structure, dead trees come out and weeds stay under 3 inches, and the department requires a total of 200 feet of clearance.